The current position:>> English >> Latest News >>  Latest News

Integrated Energy and MaurerLab Exchange Technologies on Intelligent Field

date:2016-07-25       author:Xi'an Maurer Petroleum Engineering Laboratory Co.,       hits: 96

Because of MaurerLab invitation, Integrated Energy Company CEO David Cavanagh with his assistant on July 16, 2016 had a visit to our lab. Two sides communicated smart field technology and exchanged of views on core business. Then, they had deep discussion on the integration of advanced oilfield technology. Company leaders,  related technical backbone and technical personnel actively participated in the exchange, and the atmosphere was so warm.

    Integrated Energy is a senior professional and technical team composed of independent consulting group, which is headquartered in Perth, Australia; it is desired to provide a safer, more valuable working ways for energy companies, to contribute to the development of low-carbon energy industry. They have projects in Australia, the United Kingdom, Azerbaijan, Indonesia, Norway, the United States, Africa and the Middle East accumulated to create billions of dollars for the big oil companies in the world.

    Integrated Energy is mainly engaged in the Management System and integration consulting services system. Management system consulting includes construction of efficient management framework, delivery process of upstream oil and gas projects and business covering system management, which are also including planning and scheduling, risk management, knowledge management, proper scoping (including the concept selection process), interdisciplinary optimization design, change management , cost management, quality management, HSE management, document information management and so on.

    Its integrated consulting service is primarily to make the single operating system or the project greatly fast and the performance is almost equal to implement integrated business applications under the current level. Integrated Energy is good at integrating project costs and benefits, including a detailed evaluation reports and business case. Previously, project assessment process is required full participation, combined with the high-level operating system and a particular operating system, which is able to achieve. However, the company's integrated utility operating software “workscopes” can optimize all aspects of project implementation process and especially set the specify deliverables and provide technical assistance in the later website maintenance.

       
Copyright@2014-2017 Xi'an Maurer Petroleum Engineering Laboratory Co., Ltd .All rights reserved.
Address:13F,BlockB,HuiXin IBC,No.1,Zhangba 1st Road,Xi'an City,Shaanxi Province ,China.
Tel:029-88270173 88252276 4001192112       Fax:029-88247176      E-mail:maurer@maurerlab.com
Technical support:Dayi Science and technology      陕ICP备17009532号      Access number:365938
执行时间80ms